Berita Infrastruktur di Ang Mo Kio Singapore
-
North-South Corridor enters toughest phase as hard rock and tight tunnels slow work
Rock, groundwater and tight work spaces are slowing complex sections, while engineers work around live MRT lines, busy roads and existing structures This article (LTA: North-South Corridor Singapore engineers face most challenging construction phase as rocks and viaduct slow work progress) first appeared on The Independent Singapore News.
-
LTA: North-South Corridor works hit hard rock and water seepage at Novena, Thomson
The authority will give an update on the completion timeline in due course.
-
HDB playground design guidelines take effect, Woodlands upgrades under way
New playgrounds designs include a kingfisher, a fowl, and a giant crab tower.
-
JTC and architects to study mixing industrial spaces with homes in Singapore
If built, such projects could make better use of land and bring jobs closer to homes.
- Anda yang nampak dahulu Ada sesuatu berlaku berhampiran anda? Kongsikan. Jalan ditutup, pasar malam berpindah, paip pecah, haiwan hilang — kongsikan di kawasan anda. Kongsikan sesuatu berhampiran →
-
RTS Link Woodlands North station completed, on track for 2027 opening
The project is on track to begin operations in 2027, enabling 5-minute trips between S'pore and JB.