Infrastructure news in A Hotel Kuching
-
Jerip wants Bengoh water system expanded to more Mambong villages
Mambong assemblyman Datuk Dr Jerip Susil has called for the small-scale water treatment system at Kampung Bengoh to be extended to other villages in the constituency, including Kampung Petag, Kampung Sitang and Kampung Bangau. He said the system, which draws water from downstream of Bengoh Dam, has excess capacity that could serve areas facing low water pressure in the dry season. Deputy Premier Datuk Amar Douglas Uggah Embas said the state government is working on short-term measures to address water shortages in Betong, parts of Serian and Miri.
-
Tanker driver injured, trapped in crash at Bulatan ILP Samarahan
A 36-year-old tanker driver injured his right leg after being trapped in a crash with a cargo lorry at the Bulatan ILP Samarahan Expressway junction in Kota Samarahan early this morning. Kota Samarahan fire and rescue personnel used a Rescue Tool Kit to free him before he was taken to IJN Kota Samarahan in an EMRS vehicle.
-
Batu Kitang gets over 1,200 streetlights since 2016, says assemblyman
More than 1,200 streetlights have been installed across Batu Kitang since 2016 to improve security in back lanes and housing estates, assemblyman Datuk Lo Khere Chiang said. Six CCTV cameras have also been fitted along Arang Road and in the Third Mile area. A community dialogue on security and infrastructure will be held at Choon Foh Kopitiam, Capital Garden, this Saturday.
-
Batu Kawa flood mitigation works on track, says Deputy Premier Dr Sim
Deputy Premier Datuk Amar Dr Sim Kui Hian said flood-mitigation works in Batu Kawa, Sarawak, are progressing rapidly in phases. He mentioned plans to invite media to the sites once the haze improves. The RM36.6 million Phase 2 project at Taman Desa Wira is ahead of schedule, with total investment in Batu Kawa exceeding RM200 million.