Nearbypost

Post something

Everything you can share with people nearby.

Post a Nearby PostReport what is happening around you: an accident, a road closure, a lost pet, a burst pipe, a community event. Add a photo if you have one. It goes live after a quick check. Open now

Marketplace

Property Food Opening soon Renovation Opening soon Buy / Sell Opening soon Services Opening soon Car Pool Opening soon Music

All of these need a free account, so people know who is posting.

Local News

Show news near you

Your browser will ask whether to share your location. It is used once, to find the town you are in, and is not stored.

Property stats near you Publish local news or events? Share it here, free If you run a website, a venue, a council or a community page, send us where your news lives and we will show it to readers near you. Tell us about your site →

Transport Infrastructure news in Nicoll Avenue Singapore

  1. North-South Corridor enters toughest phase as hard rock and tight tunnels slow work

    13 hours ago The Independent Singapore Novena, Singapore 4.5 km

    Singapore's North-South Corridor has entered its most technically demanding construction phase, with hard rock, groundwater and tight spaces slowing progress. At Novena, tunnelling passes within about 1m of the North-South Line, requiring smaller excavation sections and extra ground support. The 20km project includes an 8.8km viaduct and 12.3km tunnel, with the viaduct expected to open from 2027.

  2. LTA: North-South Corridor works hit hard rock and water seepage at Novena, Thomson

    2 days ago The Straits Times Novena, Singapore 4.5 km

    Singapore's Land Transport Authority said tunnelling for the North-South Corridor has run into unexpected ground conditions at Novena and Thomson, including hard rock and underground water seepage. At Novena crews are digging the northbound tunnel section by section just 1m below the operating North-South MRT line, while in Thomson harder rock was found about 10m closer to the surface than expected. LTA said it is monitoring progress and will update the completion timeline later; the corridor was previously slated to open in phases from 2027.

  3. JTC and architects to study mixing industrial spaces with homes in Singapore

    1 week ago The Straits Times Toa Payoh, Singapore 4.4 km

    JTC Corporation and the Singapore Institute of Architects are studying whether industrial and residential spaces can be combined in single buildings. Two industrial sites in Toa Payoh will be used as case studies for the design exploration.

  4. Singapore adds S$112m for built environment R&D, unveils site supervision rules

    1 week ago Channel News Asia Marina Bay Sands, Singapore 1.6 km

    Singapore's Building and Construction Authority announced an additional S$112 million in funding for built environment research and innovation under the RIE 2030 plan. The announcement was made by Minister Chee Hong Tat at the opening of the International Built Environment Week at Marina Bay Sands. New site supervision rules for large-scale projects and a refreshed Green Mark scheme were also introduced.

Listen to unique community music

Powered by Listingmine.com

Contributor sign in

Without the country code. A leading zero is fine, we will drop it.

Forgotten your password?

No account yet? Create an account