Infrastructure news in Taipei
9 stories within reach of Taipei, published in the last 30 days and gathered from Malaysian news sources.
-
KL-Karak expansion on track for early 2029 completion, says Nanta
The RM2.1 billion expansion of the Kuala Lumpur-Karak Expressway (KLK) is on track for completion by early 2029. The project includes a new 999-metre tunnel and is expected to ease congestion on the route.
-
Building Merdeka: How the nation‑building projects of 1957-65 shaped the early years of independence
KUALA LUMPUR, Aug 31 — Before Malaya had even become independent, it was already building the place where independ...
-
Cabinet gives in-principle nod to Bandar Malaysia-Seri Kembangan elevated expressway
KUALA LUMPUR, Aug 27 — The Cabinet has given in-principle approval for the proposed development of the Bandar Mala...
-
Bigger dams, more ponds, river dredging: KL and Selangor plan five flood fixes on the table
KUALA LUMPUR, Aug 23 — Kuala Lumpur and Selangor are joining forces to tackle the Klang Valley’s flood probl...
-
DBKL to resurface 59km of KL roads in RM100m project
DBKL will resurface 59km of protocol and main roads in Kuala Lumpur as part of a RM100 million project. The project aims to improve road conditions across the capital.
-
Medan Pasar set for climate-resilient revamp under KL ‘sponge city’ push, says Hannah Yeoh
KUALA LUMPUR, Aug 13 — Historic Medan Pasar in downtown Kuala Lumpur is set for a revamp aimed at improving rainwa...
-
Works minister: LPT2 concessionaire to repair fence, review long‑term safety after elephant crash
KUALA LUMPUR, Aug 5 — The concessionaire of the East Coast Expressway 2 (LPT2) has been instructed to immediately...
-
FT minister turns to Selangor for retention ponds as KL runs out of land
KUALA LUMPUR, Aug 3 — Minister in the Prime Minister’s Department (Federal Territories) Hannah Yeoh said tod...
-
Developer withdraws Kota Damansara data centre application after public concerns
The developer of a proposed data centre in Kota Damansara has withdrawn its application following public concerns. The decision was announced by Deputy Minister Ramanan, marking a halt to the project for now.