Infrastructure news in Malaysia
24 stories across Malaysia, published in the last 30 days and gathered from Malaysian news sources.
The article discusses how nation-building projects from 1957 to 1965, including the construction of key infrastructure and institutions, shaped Malaysia's early years of independence. It highlights the significance of these projects in fostering national identity and development.
Sarawak Water will conduct planned repairs on a major pipeline along Jalan Matang in Kuching from September 4-5, causing water disruption. Traffic diversions will be in place from September 3-12 to facilitate the works.
The Pahang government will seek long-term solutions to address the shallow stretches of Sungai Pahang, which affect river navigation and local activities. The state aims to implement measures to prevent further siltation and ensure sustainable river management.
Sarawak's Long Banga and Ba Kelalan STOLports will be upgraded this year with a RM30 million allocation, improving rural air connectivity in the state.
LSH Infra Sdn Bhd and Pertama Makmur Sdn Bhd Joint Venture have been awarded a contract for the Bandar Malaysia-Seri Kembangan elevated highway project. The project involves the development of an elevated highway in Malaysia.
The Cabinet has given in-principle approval for the proposed Bandar Malaysia-Seri Kembangan elevated expressway, a major infrastructure project aimed at improving connectivity in the Klang Valley. The expressway is expected to ease traffic congestion and support urban development in the region.
The Sabah state government plans to upgrade the road stretch from Sabah International Convention Centre (SICC) to Menera Kinabalu, abandoning a previous permanent bridge plan. The upgrade aims to improve traffic flow and infrastructure in the area.
Repair works are underway at Kuching International Airport after a storm damaged parts of the ceiling. The airport authority is addressing the damage to ensure safety and normal operations.
Strong winds and heavy rain damaged a section of the roof at Kuching International Airport's arrival area. The incident occurred on August 25, and a video captured the damage. Authorities are likely to assess and repair the affected area.
KUALA LUMPUR, Aug 23 — Kuala Lumpur and Selangor are joining forces to tackle the Klang Valley’s flood probl...
KUALA LUMPUR, Aug 23 — Kuala Lumpur is turning to technology to keep a closer watch on its ageing trees, with City...
GEORGE TOWN, Aug 21 — The Penang Hill cable car project has reached 32 per cent completion and is expected to be physica...
JERANTUT, Aug 20 — The reconstruction of a dilapidated building at Sekolah Kebangsaan (SK) Felda Kota Gelanggi 1 h...
GOMBAK, Aug 20 — The RM2.1 billion Kuala Lumpur-Karak Expressway (KLK) expansion project, including a new 999-metr...
KUALA LUMPUR, Aug 20 — A total of 59 kilometres (km) of protocol and main roads in the capital, covering about 1.3...
MELAKA, Aug 19 — Melaka Sentral Sdn Bhd (MSSB) has denied claims that the terminal has been operating without air-...
KUALA LUMPUR, Aug 19 — The Ministry of Works (KKR) is seeking a higher allocation in the 2027 Budget compared with...
JOHOR BAHRU, Aug 18 — The government will build a bridge between the Bukit Chagar RTS Link Station and KTMB Komute...
SEBERANG PERAI, Aug 18 — The Works Ministry has fully used its roughly RM2 billion allocation for road maintenance...
SEBERANG PERAI, Aug 18 — An estimated 75 per cent of delayed and sick construction projects nationwide are due to...
GEORGE TOWN, Aug 17 — The proposed undersea tunnel or third bridge linking Penang island to the mainland was inclu...
GEORGE TOWN, Aug 17 — Penang Hill’s iconic funicular will take a short break from January 4 to 10, 2027 for...
KOTA KINABALU, Aug 17 — Residents of Kingfisher Putatan Condominium (KFP) are refusing to pay the more than RM120,...
GEORGE TOWN, Aug 14 — The identification of the coastal area from Tanjung Bungah to Batu Ferringhi as a potential...