Transport Infrastructure around you
-
Section of Tun Dr Lim Chong Eu Highway Closed 45 Days for LRT Works
A section of the Tun Dr Lim Chong Eu Highway in George Town will be closed periodically for 45 days from 16 September to 31 October for utility relocation and road widening under the LRT Mutiara project. The closures affect the leftmost lanes and slip roads at several locations heading towards Komtar and Bayan Lepas. MRT Corp has advised motorists to exercise caution.
-
PIL2A Phase 1 in Penang 29.85% complete, on track for 2028 opening
The first phase of the Pan Island Link 2A (PIL2A) highway in Penang has reached 29.85 per cent completion, 0.42 per cent ahead of schedule. The RM420 million project, which includes a marine bridge, is expected to open to traffic in December 2028. The highway will connect Jalan Permatang Damar Laut to the future Silicon Island development.
-
Night closures on Tun Dr Lim Chong Eu Expressway in Penang from Sept 7 to 9
The George Town-bound stretch of the Tun Dr Lim Chong Eu Expressway in Penang will be closed nightly from Sept 7 to 9 for construction of an elevated U-turn facility. The closures, from 10pm to 5am, are part of ongoing highway works linked to the upcoming Air Itam Bypass.