Infrastructure news in Batang Kali Selangor
-
Burst pipe on Jalan Pending disrupts Kuching water supply, mayor urges faster repairs
A burst water pipe near Crown Tower on Jalan Pending in Kuching has disrupted supply to residents and businesses. Kuching South City Council mayor Wong Hong Sheng visited the site and urged Sarawak water authorities to speed up repairs.
-
RM350,000 to upgrade roads and lifts at Bandar Tasik Selatan flats
The government has allocated RM350,000 to upgrade road structures at the Bandar Tasik Selatan low-cost flats in Kuala Lumpur under the 2026 Projek Mesra Rakyat initiative. The flats' lifts will also be repaired, and a RM72,000 Flexi EV Charging station with four chargers was launched at the same event. Dr Wan Azizah Wan Ismail also presented tuition sponsorship to 10 Form Five students.
-
Jalan Syed Putra-Jalan Istana junction to close nightly from Sept 14 for NPE 2 works
The intersection of Jalan Syed Putra and Jalan Istana in Kuala Lumpur will be closed in stages from September 14, between 10pm and 5am, for preliminary works on the New Pantai Expressway Extension Project (NPE 2). New Pantai Expressway Sdn Bhd advised motorists to plan their journeys and follow traffic management measures.
-
Citaglobal wins RM82.1mil subcontract to build residential college at IPG Lembah Pantai
Citaglobal Bhd, through its wholly owned subsidiary Citaglobal Land Sdn Bhd, has secured an RM82.1 million design-and-build subcontract from Purnama Base Sdn Bhd. The project covers a residential college at the Institute of Teacher Education's Malay Language Campus in Lembah Pantai, Kuala Lumpur, and is due for completion on 30 June 2028. The 22-month contract is expected to contribute positively to the group's earnings.
- You saw it first Something happening near you? Post it. Road closed, night market moved, burst pipe, lost pet — share it nearby. Post something nearby →
-
Mondelez invests RM90mil in Shah Alam Cadbury plant, adds Crumb Tower
Mondelez International has invested RM90 million in its Cadbury confectionery plant in Shah Alam, Selangor, launching a new Crumb Tower that lets the factory produce chocolate crumb locally instead of importing it from South Africa and Australia. Selangor Menteri Besar Amirudin Shari said the investment shows confidence in the state as a long-term manufacturing base, while Mondelez's Malaysia and Singapore managing director Simon Crowther said it strengthens self-sufficiency and Shah Alam's role in the regional network.
-
Guan Eng trial: MACC investigator stands by claim Zenith BUCG had edge in Penang tunnel bid
An MACC investigator told the Sessions Court in Kuala Lumpur that Consortium Zenith BUCG had more advantages than four other bidders for the Penang undersea tunnel and road projects. Under cross-examination in Lim Guan Eng's corruption trial, Zulhilmi Ramli disagreed with the defence that a 2011 Malaysia-China MoU did not guarantee the company the contract. The four other bidders were named in court.
-
Jalan Sultan Azlan Shah closed 322 days for Mutiara LRT works
MRT Corp announced that Jalan Sultan Azlan Shah in George Town will have a 322-day traffic diversion from Sept 12, 2026 to July 31, 2027 for piling and structural works on the Mutiara Line LRT. Jalan Magazine will also be partially closed from 10pm on Sept 14 to 5am on Oct 5 for road widening and utility relocation.
-
IJM launches AI traffic control centre for three highways, cuts response times by 33%
IJM Corporation launched its AI-powered Smart Highway Traffic Control Centre at the Besraya Loke Yew toll plaza lay-by. The system, which covers Besraya, NPE and LEKAS, uses AI and IoT to detect incidents faster and reduce emergency response times to between eight and 10 minutes. Works Minister Alexander Nanta Linggi officiated the launch and said no retrenchments are planned.