Infrastructure news in Jalan Kayu Singapore
-
NetLink Trust: fibre outage in Bishan and Thomson to be fixed by Wednesday morning
About 2,000 Singtel, StarHub and M1 broadband users in parts of Bishan and Thomson lost fibre service after a third-party contractor damaged multiple NetLink Trust cables. NetLink Trust says restoration is under way and should be complete by Wednesday morning.
-
Fibre cut disrupts Singtel, StarHub and M1 internet services
A fibre connection cut on Tuesday (Sept 15) caused temporary internet disruption for customers of Singtel, StarHub and M1 in Singapore. NetLink Trust said about 1,200 users in Bishan and Thomson may have been affected, and it is working with telcos to restore service.
-
Safety operators keep watch as driverless shuttles run in Punggol
In Punggol, 24-year-old Sherman Seng works as a safety operator for Zig Driverless, a ComfortDelGro unit, monitoring autonomous shuttle rides that began in April. He and 12 other operators watch for vehicle errors, take manual control when needed and feed problems back to engineers. Seng trained three weeks in Guangzhou before operating the shuttles.
-
North-South Corridor enters toughest phase as hard rock and tight tunnels slow work
Singapore's North-South Corridor has entered its most technically demanding construction phase, with hard rock, groundwater and tight spaces slowing progress. At Novena, tunnelling passes within about 1m of the North-South Line, requiring smaller excavation sections and extra ground support. The 20km project includes an 8.8km viaduct and 12.3km tunnel, with the viaduct expected to open from 2027.
- You saw it first Something happening near you? Post it. Road closed, night market moved, burst pipe, lost pet — share it nearby. Post something nearby →
-
LTA: North-South Corridor works hit hard rock and water seepage at Novena, Thomson
Singapore's Land Transport Authority said tunnelling for the North-South Corridor has run into unexpected ground conditions at Novena and Thomson, including hard rock and underground water seepage. At Novena crews are digging the northbound tunnel section by section just 1m below the operating North-South MRT line, while in Thomson harder rock was found about 10m closer to the surface than expected. LTA said it is monitoring progress and will update the completion timeline later; the corridor was previously slated to open in phases from 2027.
-
HDB playground design guidelines take effect, Woodlands upgrades under way
Singapore's Housing Board released playground design guidelines in December 2025 setting mandatory features for playgrounds in new Build-To-Order estates and those being redesigned or upgraded, including HDB public parks. The rules group play into physical, creative and social categories, and the first playground built to them, the Kingfisher, is coming to 628 Woodlands Ring Road as part of an estate upgrade. Other Woodlands playgrounds, including a chicken-themed one at 619 Woodlands Drive 52 and a crab tower at 631 Woodlands Ring Road, are also planned.
-
JTC and architects to study mixing industrial spaces with homes in Singapore
JTC Corporation and the Singapore Institute of Architects are studying whether industrial and residential spaces can be combined in single buildings. Two industrial sites in Toa Payoh will be used as case studies for the design exploration.